Two Decades of Promoting Cycling in Leighton Buzzard

Buzzcycles Photo Collage

2006

First Stall at May Fayre

230+

Bikes Fixed

15

Years of Led Rides

2021

Green Wheel Proposed

Our History

*

2006

Cycel Signage

Leighton BuzzCycles was founded in 2006 as the Leighton Linslade Cycling Forum (LLCF) by Esther Clarke, the local Cycling UK Right to Ride representative.

Buzzcycles has had a stall at May Fayre since 2006 and the Canal Festival from the first one.

*

2007

Img 1041

The first task was to create a cycle strategy to identify what was needed and to influence what was delivered by first Beds County Council and then Central Beds. This first strategy was published in 2007 and presented to Beds County Council.

There had never been a cycle map for Leighton Buzzard, so the LLCF created one. Central Bedfordshire Council (CBC) later adopted it.

*

2009

Leighton Buzzard Go Cycle Team 2009

In 2009, Leighton-Linslade was awarded Cycle Town status for a three-year project. The LLCF was a key part of the bid.

In 2009 the LLCF changed its name to Leighton BuzzCycles.

Led rides start and have been a key part of BuzzCycles activity for over 15 years and continue to be so.

*

2013

Cycling Strategy 2013 16x9

The third edition of the Leighton Buzzard and Linslade Cycling Strategy is issued

*

2016

Graphic showing how communities could be lined together with inner wheel and outer wheel with spokes radiating from the Town Centre

BuzzCycles proposes a Green Wheel featuring two circular rims —an inner and an outer rim—designed to connect communities and green spaces. These routes will be linked by “spokes” to each other and the Town Centre, promoting active travel without relying on cars.

*

2020

Dr Bike P1050959

Dr Bike cycle maintenance has always been important but became more so during lockdown when Buzzcycles was awarded a grant by Cycling UK’s Big Bike Revival project to run Dr Bike sessions on the market.

*

2021

Cargo Bike Trying To Pass Barriers Morrisons Leighton Buzzard

Getting cycle infrastructure improvements can take years. BuzzCycles lobbied successfully to have the cycle path barriers adjacent to Morrisons supermarket removed improving connectivity for local cycling journeys and though using the national cycle route.

The “Cycling Strategy for Leighton Buzzard and Linslade” has been regularly updated and was submitted as BuzzCycles’ contribution to the LCWIP (Local Cycling and Walking Investment Plan).

*

2024

5 cyclists using a cycle path

Led cycle rides are back in full swing after the pandemic, with the new summer evening series proving a popular addition.

Started delivering Dr Bike indoors at The Repair Cafe, enabling BuzzCycles to provide a monthly free bicycle repair service.

*

2025

Bicycles on the cycle stands located at Waitrose, Leighton Buzzard

New Cycle Stands were installed at Waitrose, enabling cycling shoppers to lock their bicycles outside Waitrose supermarket. Another successful example of a multi-year lobbying campaign.